We write the plan for your building instead of pulling an old spec off the shelf. A spec borrowed from another job usually brings confusion, delays and extra cost, because it was written for a different roof and different goals. Ours says what we're installing, how thick, what finish goes on it and what it's meant to do, so you can hold any bid up against it.
Timing matters as much as material. If a reroof is already on the calendar, that's usually the moment to insulate, because the roof gets opened once instead of twice, so I'll ask about it when I come out. If water is already dripping or old insulation is falling down, I'd rather fix that now than wait for the roofers.
Moisture control goes into the plan from the start, not as an add-on, and we lay out the seams and pipe openings so your staff can find them and keep them sealed later. If your building sits over a crawl space, a crawl space vapor barrier handles ground moisture, and vapor barrier installation covers walls and ceilings that need their own moisture layer.